Services Provided: Installation of cable trays, cable pulling and connection and installations of electrical equipment, in the GBD 2 North in Nuclear facility.

Project Details

Date:2012-2013
Main Contractor:Areva
Country:France
Construction:Construction activities consisting of: Cable pulling, 8 km. 29 Km earthing cable, 30.000 wires connections. And electrical equipment installations such as electrical sockets, junction boxes, 96.000 m of conduit. Installation of 15.000 m air piping with supports. We worked on equipment used specially in Nuclear Plants, such as radiation detectors G64, dosimeters, Alpha-beta filters and specific alarm system.